SeaLifeSea Breeze Guide← To the portal
Under construction · handover 2029 under construction · handover 2029
To the map
Whitestone Beach — buildings on the shoreline (aerial footage, CC BY)
Whitestone Beach — buildings on the shoreline (aerial footage, CC BY)

About the complex

Home ↘ About the complex

The Whitestone Beach residential complex under construction on the Sea Breeze shoreline.

The complex

What it is

About the complexA residential complex on the Caspian shoreline: four nine-story buildings with “wavy” facades, each designed to open up the view of the sea as much as possible. The developer promises an infinity pool and its own beach. Apartments of 40 to 125 m² — both for permanent residence and for vacations; handed over without finishing.
Statusunder construction · handover 2029

Source: seabreeze.az, the news item “Whitestone Beach: Sales Launch for New Beachfront Complex”, 04.03.2026

Characteristics

The numbers

The buildings4 buildings with wavy facades
Number of floors9 floors
Apartments406
Areas40–125 m²
Total area41 125 m²

Timeline

Sales and handover

March 4, 2026

The start of sales of apartments at Whitestone Beach.

2029

The planned handover of the complex.